Holborn · Architecture & decoration

Kingsway & High Holborn

On the main streets, the architecture has a larger scale and the decorating programme often has more participants. A floor manager, fit-out contractor and occupier need to understand the same scope, access window and finish standard.

Discuss your project
Edwardian Portland stone office frontage with tall windows beside a broad central London street

Portland stone outside, individual interiors within

Camden’s Kingsway conservation statement describes the broad street’s early twentieth-century composition and decorated Portland stone façades, alongside later buildings. The stone frontage provides context for the repaint; it is not a surface to coat by default. Identify the existing interior, window components and any painted exterior elements separately.

Sources: Camden: Kingsway conservation statement

High Holborn is an address, not a single specification

A modern office floor behind an older elevation may need a different approach from a retained period room. Request the available drawings and refurbishment information, then confirm what is actually present. A complete ceiling repaint, local making-good around new fittings and decoration of existing joinery are distinct instructions that should be priced and reviewed accordingly.

Agree the route from loading point to floor

A broad main road does not guarantee straightforward servicing. Confirm the permitted delivery entrance, any goods-lift booking and the route past reception. If materials must be carried through occupied space, include that movement in the working arrangement. Responsibilities for equipment, waste and shared-area protection should sit alongside the room schedule.

Treat the evening window as a limited resource

Count set-up and clearing away within the proposed session, and check when other contractors or cleaners need entry. Discuss which tasks can be completed without affecting neighbouring occupiers and which need a different window. A paint application may suit an evening; noisy preparation requires its own assessment under the applicable rules.

Sources: Camden: noisy building works; City of London: construction noise

A Holborn decorating brief

Bring the rooms
into the conversation.

Tell us how the property is used, which surfaces need attention and who will approve the work. For an office, include the hours when rooms are available; for a home, let us know what will remain in place.

Describe the proposed work

Include the Holborn address, the rooms or frontage involved, and any restrictions set by the building manager.

Read our privacy policy about how we handle your enquiry.